Design Build vs. Architect/GC Format
In our Design/Build format, we co-ordinate simultaneous design, approvals, engineering and selections instead of the traditional method of one task following the next. The result is a significant schedule benefit to the Owner, a savings of up to half a year. Many design and construction firms talk about schedules, we actually use schedules to co-ordinate the design and construction process.
Architect / GC Format
In the traditional construction delivery format, where the architect completes design, after which a builder obtains permits, does pricing and mobilizes to construct, these tasks happen one after the other. The schedule looks like this:
Subdivision approvals
Building & Architectural design and specifications
Site engineering for building
This is a series of tasks, one after the other.
The durations will vary from this for each project and are used for comparison only
Design Build Format
In our Design Build format, we are able to put the various tasks on PARALLEL tracks simultaneously. The occupancy date is up to half a year sooner, a great benefit to the owner.