Second Floor Addition

The second floor was framed and weather tight in one week, completed in about 2 months.  Here is a link to a blog the owners kept.   The new second floor consists of three bedrooms including a master bedroom with vaulted ceiling, a new full bathroom with separate toilet and tub room, new high efficiency central HVAC and hot water heater,  r19 walls and r30 roof.